Kejia kitchen supply · Foshan, China · Since 1995
nicolas1681688@gmail.comPrivacy

Before you order, put the details on paper.

Use this kitchen cabinet sourcing checklist to review construction, drawings, samples, quotation inclusions and delivery responsibilities before placing an order.

01 / PROCUREMENT CHECKLIST

The construction

Specify cabinet bodies, door fronts, backs, edging and hardware as separate components. For each, record the brand or supplier, series, core, finish and agreed dimensions. A veneer surface does not mean a solid-wood cabinet; PET does not identify the core.

Ask for a component schedule, sample cross-section and the documentation relevant to the exact materials.

02 / PROCUREMENT CHECKLIST

The drawings

Identify the room dimensions, units and approved drawing revision. Record appliance openings, plumbing positions, fillers, plinths and access conditions. Agree who measures, checks and approves the dimensions.

Ask for numbered elevations, a cabinet schedule and a documented change process.

03 / PROCUREMENT CHECKLIST

The approved sample

Confirm the color, sheen, grain direction and surface feel against an identified sample. Natural veneer has variation; discuss what is acceptable and how later orders will be matched.

Record a sample reference, date and the actual materials it represents.

04 / PROCUREMENT CHECKLIST

The quotation

Compare quotations using the same drawings, quantities and material schedule. Separate cabinets, hardware, countertops, appliances, lighting and accessories. Confirm the trade terms, named place and responsibility for freight, customs and installation.

Request an inclusion/exclusion list and project-specific price and timing.

05 / PROCUREMENT CHECKLIST

Delivery & aftercare

Define the start conditions for production, packaging identification and any staged shipment requirements. Agree how damage, missing parts and dimensional issues will be documented and handled.

Confirm component-specific warranty terms, evidence needed and responsibility for replacement shipping and local labor.

This is a procurement framework, not a promise of a fixed lead time, warranty, installation service or certification. Confirm the actual project terms with Kejia.

From your plan to a clear specification.

A practical path for your cabinetry project.

Start your project
01

Share your brief

Room plans, quantities, preferred finishes and destination.

02

Develop the specification

Agree layouts, materials, hardware and the quotation scope.

03

Confirm the details

Approve drawing revisions, samples and production requirements.

04

Coordinate supply

Document packing, delivery and installation responsibilities.

Confirm the actual scope with your supplier.

This kitchen cabinet sourcing checklist is a starting framework for dealer and project buyers. Match each requirement to the selected products, approved drawings and contract scope. Ask for supporting documentation relevant to the exact materials and destination.