Materials & procurement
Cabinet sample approval, recorded clearly.
Use a cabinet sample approval record to identify color, sheen, grain, substrate and hardware before agreeing the appearance of a kitchen cabinet order.
Discuss your specification
Identify what the sample represents
Give the sample a reference and record the date, product system, substrate and finish. State whether it represents a front, exposed end panel, edge, hardware finish or another component.
Photographs and screen colors are useful for shortlisting. For the agreed physical appearance, compare the actual sample under the lighting relevant to your selection process.
Agree variation and matching
Natural wood and veneer have individual grain and color variation. Identify grain direction, matching expectations across adjacent fronts and the range of variation discussed for the order.
For repeat orders, retain the approved sample reference and request a review of the available material and batch. An earlier approval does not establish that every later batch will be identical.
Connect approval to the drawing revision
Record who approved the sample and which drawings and cabinet schedule it accompanies. Keep any conditions or remaining decisions attached to that record.
If a material or finish changes, identify the replacement and obtain the required approval before treating the old sample as applicable. The sample record should support the order, not contradict it.
Specification checklist
| Item | Record in your brief | Confirm before ordering |
|---|---|---|
| Reference | Sample ID, approval date and reviewer | Identified sample available to both teams |
| Appearance | Color, sheen, texture and grain | Conditions and acceptable variation |
| Construction | Substrate, surface and edges | Actual components represented |
| Order link | Drawing revision and cabinet schedule | Reapproval after a material change |
Questions before you order
Does a photo replace cabinet sample approval?
A photo is helpful for discussion, but lighting and displays can change its appearance. Record the physical sample and construction agreed for the order.
How should dealers handle a repeat-order finish?
Retain the original sample reference and confirm the proposed material and batch for the new order. Document any difference before agreeing matching expectations.
Prepared from Kejia’s product and overseas-buyer knowledge base, updated November 2026. Product-specific construction, documentation, price and supply terms are confirmed for the actual order.
Put the details into your project brief.
Share your room plans, selected designs, preferred materials, quantities and destination.
Request a custom cabinet quote